Flowing screed - The process


1

Sub- base, clean and clear of any loose debris. Lay polythene and fix perimetre edging strip.

lay polythene

2

Tape down all joints and pvc apron on perimeter edging strip to ensure there will be no grout loss.

tape down joints

3

Set-up floor levels using self levelling lazer and thread level indicators.

set up floor levels

4

Flow test material.

flow test material

5

Pour flowing screed to desired level (following thread level indicators.)

pour flowing screed

6

Remove tripods.

remove tripods

7

Finish and close surface using dappler bars.

finish floor

8

Finished floor.

finished floor